|
This floor was a complete failure. This was caused by thermal expansion and contraction
|
Almost 80% of the tiles came up in whole pieces
|
All of the thin set had to be removed to prepare for the anti-fracture membrane
|
The anti-fracture membrane needed to be applied. The concrete floor had many cracks in it
|